USW | Pace - Training Guides to Industry
HOME      ABOUT US      INDUSTRY      PHOTOS      GLOSSARY      CONTACT US      YOUR PRIVACY      
SITE SEARCH

 

Hot Rolling

 The Hot Mill receives the slabs for rolling.If necessary, they must be heated to about 2,300 degrees F.By the time the strip leaves the roughing stands, it has cooled to about 1,900 degrees and is about 1.4 inches thick and 180 feet long. The steel is rolled into a Hot Band.

 

The Strip Finish receives the hot band coil of steel leaving the Hot Mill.

Click Here to download a printable copy of the Hot Rolling Process.

 

These documents are Acrobat Reader  PDFs.
If you do not have Acrobat Reader
CLICK HEREfor a free download.